HOME | US Navy - ships | US Navy - air units | USMC - air units | International Navies | Weapon Systems | Special Reports

 

 

Greece - Hellenic Navy
Poseidon (Type 209-1200) class Submarine

 

 
poseidon class submarine type 209-1200 hellenic navy amfitriti okeanos pontos hdw kiel greece
   

 

Units:
S 116 HS Poseidon (1979)
S 117 HS
Amfitriti
(1979)
S 118 HS
Okeanos
(1979)
S 119 HS Pontos (1980)
 
Specifications:
Length: 55,9 meters (183 feet 5 inches)
Beam: 6,3 meters (20 ft 8 in)
Draft: 5,5 meters (18 ft)
Displacement: 1285 tons (submerged)
Speed: 11 knots (20 km/h) - surface / 21 knots (39 km/h) - submerged
Range, surfaced: 11000 NM (20400 km) at 10 knots (19 km/h)
Range, snorkel: 8000 NM (14800 km) at 10 knots (19 km/h)
Range, submerged:
400 NM (740 km) at 4 knots (7 km/h)
Endurance:
50 days
Maximum depth:
500 m
Complement:
33

Propulsion:
Diesel-electric
4 x MTU diesel engines (5000 shp)
4 x AEG generators
4 x 120-cell batteries
1 shaft, 1 propeller


Armament:
8 x 21" (533mm) bow torpedo tubes
for
14 533mm heavyweight torpedoes
optional UGM-84 Harpoon SSM

 

Program "Neptune II" (S 118 HS Okeanos only):
Upgrades and refits, including AIP capabilities very similar to Type 214, are so extensive that justify the S 118 boat as a new and separate class when compared to the rest of Type 209/1200 vessels. New dimensions are similar to Type 214 boats.

"Neptune II" upgrade including Air-Independent Propulsion (AIP) insert was cancelled for the other 3 units of this class.

 

Boat data:
 
S 116 HS Poseidon

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: January 15, 1976
Launched:
March 21, 1978
Commissioned:
March 21, 1979
IN SERVICE
  
 
S 117 HS Amfitriti

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: April 26, 1976
Launched:
June 14, 1978
Commissioned:
September 14, 1979
IN SERVICE
  
  
S 118 HS Okeanos

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: October 1, 1976
Launched:
October 16, 1978
Commissioned:
November 15, 1979
IN SERVICE
   
 
S 119 HS Pontos

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: January 25, 1977
Launched
: March 21, 1979
Commissioned:
April 18, 1980
IN SERVICE
   
 

images


s-116 hs poseidon type 209-1200 class submarine hellenic navy 03
S 116 HS Poseidon

s-116 hs poseidon type 209-1200 class submarine hellenic navy 02
S 116 HS Poseidon

s-119 hs pontos poseidon type 209-1200 class submarine hellenic navy 03
S 119 HS Pontos

s-119 hs pontos poseidon type 209-1200 class submarine hellenic navy 04
S 119 HS Pontos

s-119 hs pontos poseidon type 209-1200 class submarine hellenic navy 02
S 119 HS Pontos



s-116 hs poseidon insignia crest patch badge submarine hellenic navy   s-117 hs amfitriti insignia crest patch badge submarine hellenic navy
Poseidon - Amfitriti

s-118 hs okeanos insignia crest patch badge submarine hellenic navy   s-119 hs pontos insignia crest patch badge submarine hellenic navy
Okeanos - Pontos
 
 
| seaforces.org | Hellenic Navy start page |