|
|
|
|
|
|
|
|
|
|
|
|
Moroccan
Royal Navy
|
|
|
Lieutenant de Vaisseau Rabhi (Vigilance) class
Patrol Vessel
|
images wanted
|
|
Ships:
|
unit
|
laid down
|
launched
|
commissioned
|
|
P 310 RMNS Lieutenant de Vaisseau Rabhi
|
|
September 23, 1987
|
September 16, 1988
|
|
P 311 RMNS Errachiq
|
|
September 23, 1987
|
December 16, 1988
|
|
P 312 RMNS El Akid
|
|
March 29, 1988
|
April 4, 1989
|
|
P 313 RMNS El Maher
|
|
March 29, 1988
|
June 20, 1989
|
|
P 314 RMNS El Majid
|
|
October 21, 1988
|
September 26, 1989
|
|
P 315 RMNS El Bachir
|
|
October 21, 1988
|
December 19, 1989
|
|
|
Specifications:
|
Builder:
|
E.N. Bazan (later Izar / now
Navantia), Cadiz, Spain
|
Length:
|
58,10 meters
|
Beam:
|
7,60 meters
|
Draft:
|
2,70 meters
|
Displacement:
|
425 tons (full load)
|
Speed:
|
22
knots
|
Range:
|
3800 Nm (7000 km) at 12 knots
|
Crew:
|
36 (+ 15 passengers)
|
Aviation:
|
none
|
Propulsion:
|
2 x
MTU 16V956 TB82 diesel engines (7600 bhp)
2 shafts / 2
propellers
|
Armament:
|
Guns:
1 x
Bofors 40-mm/70-caliber gun
1 x Oerlikon 20-mm/90-caliber twin gun
|
Systems:
|
2 DECCA navigation radars
|
|
|
P 310 RMNS Lieutenant de
Vaisseau Rabhi
|
images wanted
|
|
P 311 RMNS Errachiq
|
|
|
P 312 RMNS El Akid
|
|
|
P 313 RMNS El Maher
|
|
|
P 314 RMNS El Majid
|
|
|
P 315 RMNS El Bachir
|
|
|
| seaforces.org | Moroccan Royal
Navy start page |
|
|
|
|
|
|
|
|
|
|