HOME | US Navy - ships | US Navy - air units | USMC - air units | International Navies | Weapon Systems | Special Reports

 

 

Greece - Hellenic Navy
Glaukos (Type 209-1100) class Submarine

 

 
glaukos class type 209-100 submarine hellenic navy greece nereus triton proteus
   

 

Units:
S 110 HS Glaukos (1971)
S 111 HS
Nireus
(1972)
S 112 HS
Triton
(1972)
S 113 HS Proteus (1972)
 
Specifications:
Length: 54,1 meters (177 feet 6 inches)
Beam: 6,2 meters (20 ft 4 in)
Draft: 5,9 meters (19 ft 4 in)
Displacement: 1207 tons (submerged)
Speed: 11 knots (20 km/h) - surface / 21 knots (39 km/h) - submerged
Range, surfaced: 11000 NM (20400 km) at 10 knots (19 km/h)
Range, snorkel: 8000 NM (14800 km) at 10 knots (19 km/h)
Range, submerged:
400 NM (740 km) at 4 knots (7 km/h)
Endurance:
50 days
Maximum depth:
500 m
Complement:
31

Propulsion:
Diesel-electric
4 x MTU diesel engines (5000 shp)
4 x AEG generators
4 x 120-cell batteries
1 shaft, 1 propeller


Armament:
8 x 21" (533mm) bow torpedo tubes
for
14 533mm heavyweight torpedoes

 

 

 

Boat data:
 
S 110 HS Glaukos

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: September 1, 1968
Launched:
September 15, 1970
Commissioned:
November 5, 1971
Decommissioned:
June 9, 2011
  
 
S 111 HS Nireus

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: January 15, 1969
Launched:
July 7, 1971
Commissioned:
February 10, 1972
IN SERVICE
  
  
S 112 HS Triton

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: June 1, 1969
Launched:
October 19, 1971
Commissioned:
August 8, 1972
IN SERVICE
   
 
S 113 HS Proteus

Builder: Howaldtswerke-Deutsche Werft (HDW), Kiel, Germany

Laid down: October 1, 1969
Launched
: February 1, 1972
Commissioned:
November 23, 1972
IN SERVICE
   
 

images


     
Nireus - Triton - Proteus
 
 
| seaforces.org | Hellenic Navy start page |